By: ValentinHirschi <valentin.hirschi@gmail.com>
record full-orientation joint sampling cost and stability failures Archive the fixed physical setup, original Samples, native audit and warmed 20-worker timing evidence from 072c9999e. Optimized LMB meets the cost gate; the joint candidate needs evaluator optimization and one stability diagnosis. No integration improvement is claimed. Validation: all archived uncompressed hashes checked; 936 orientations, six cuts and unchanged saved-state hashes verified; timing subset ratios rebuilt. User request: (continue as planned but make sure the time spent in the sampling maps is still quite significantly less than the actual GL638 all-orientation integrand, i.e. it's not crucial to optimize the runtime of the sampling, except if it is somehow comparable to the integrand time; it should be like 10% at the very most, once below that then no need to optimize further).
| Time to Start | Worker time | Duration | Time to finish | Idle | |
|---|---|---|---|---|---|
| Config | 2s | 9s | 9s | 12s | 2s |
| Eval | 9s | 51s | 51s | 1m01s | 0s |
| Build | 50s | 46m04s | - | - | 0s |
| Test | 2m41s | 25m50s | - | - | 46s |
| Deploy | - | - | - | - | 22m40s |
| Suite | 2s | 1h12m56s | - | - | 23m29s |