9074bc8c

By: Kaapo Seppänen <seppanenkaapo@gmail.com>

checkpoint LTD direct-3D UV integration

Enable the experimental vacuum and medium LTD/direct-3D path and index Fermi sectors by representation. Bump the saved CLI state manifest to 17; older amplitude states require regeneration.

Preserve the unresolved Arb-level local-UV numerator mismatch, the exact-forest proof timeout, and the unrun mechanism diagnostic. Document reproduction commands, validation results, and resume steps in THERMAL_LTD_HANDOFF.typ. CI remains disabled for this work-in-progress checkpoint.

Total

1s

Time to Start Worker time Duration Time to finish Idle
Config 0s 1s 1s 1s 0s
Eval - - - - -
Build - - - - -
Suite 0s 1s 1s 1s 0s

Timeline

Config
0s