By: ValentinHirschi <valentin.hirschi@gmail.com>
Add the FABLE_5_1 five-loop vacuum campaign plan as the branch goal Physics-scoped QCD-renormalization entry class, Ready-first scheduler and admission package, CP5 checkpoint and memory redesign with a semantics-version resume binding, launcher/monitor changes, profiling protocol, pilots and the launch/monitoring thresholds for a fresh campaign in the fable_5_1 Zellij tab. Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
| Time to Start | Worker time | Duration | Time to finish | Idle | |
|---|---|---|---|---|---|
| Config | - | - | - | - | 37m31s |
| Eval | - | - | - | - | - |
| Build | - | - | - | - | - |
| Suite | - | - | - | - | 37m31s |