b977b73e

By: ValentinHirschi <valentin.hirschi@gmail.com>

Master plan for the next push: v3 epoch engine, work-volume lane, launch criterion

27-agent review (8 survey lenses over code, measurements, all Fable-era notes,
algorithms, native inspection, inputs, systems and literature; 4 strategies;
12 skeptic votes; synthesis; 32-point completeness critique and revision).
Waves W0 (intel, oracles, harnesses, work-volume bounds) to W5 (iterate until
dry, rehearse, launch), each gated by <= 1 h pilots; decisions D1-D8 for the
owner at the end of W0; launch criteria (A)-(G).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
GitHub
configure