By: ValentinHirschi <valentin.hirschi@gmail.com>
Master plan for the next push: v3 epoch engine, work-volume lane, launch criterion 27-agent review (8 survey lenses over code, measurements, all Fable-era notes, algorithms, native inspection, inputs, systems and literature; 4 strategies; 12 skeptic votes; synthesis; 32-point completeness critique and revision). Waves W0 (intel, oracles, harnesses, work-volume bounds) to W5 (iterate until dry, rehearse, launch), each gated by <= 1 h pilots; decisions D1-D8 for the owner at the end of W0; launch criteria (A)-(G). Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
| Time to Start | Worker time | Duration | Time to finish | Idle | |
|---|---|---|---|---|---|
| Config | - | - | - | - | 7m16s |
| Eval | - | - | - | - | - |
| Build | - | - | - | - | - |
| Suite | - | - | - | - | 7m16s |